Turn off the main water supply to the house, and in a convenient location, cut the hot and cold water supply pipes for the bathroom. Also cut out and remove all the existing water lines and fittings in the bathroom. Finally, cut out and remove the vent section leading to the sink and the main stack 5 in. below the vent tee. Stuff rags into open drain lines to keep sewer gas out of the house.
×