The wall-hung toilet’s supply line must have a male adapter with a temporary galvanized cap. Check the instructions on the toilet to get the proper location. Routing water supply lines is different in every bathroom, so you’ll have to adapt runs to your situation. But run the plastic drain lines and vents before starting any supply work. It’s much easier to route water supply lines around drain lines than to route drains and vents around supply lines. The same thinking applies to electrical work: Wait until the water supply work is finished before wiring.
Tear out the existing piping (Photos 5 and 6). Then frame the 2×6 walls that will contain the new plumbing and the opposite end of the shower base (Photos 8, 9 and 14). It’s easiest to nail the bottom plate to the floor and the top plate to the ceiling, then fill in the studs one at a time by toenailing them in at the top and bottom. Stack the studs directly in front of the old ones wherever possible. Space the studs in the center of the shower about 12 in. apart to leave room for the shower valve and showerhead. The studs behind the toilet should be spaced exactly 19-3/4 in. apart for securing this toilet chair carrier (Photos 8 and 15).
The Home Depot is a great place to buy your bathroom essentials and remodeling materials. We also provide top-rated design and installation services for homeowners across America. Besides undergoing full background checks, our hand-selected remodeling experts are local, licensed and insured. The Home Depot also offers a great selection of flexible finance options.
The average bathroom remodel costs $10,445 Most homeowners spend between $5,975 and $14,927. You can spend as little as $3,500 to $7,000 updating the essentials in a small or medium-sized bathroom. On a large or master bath, you could spend $25,000 or more. Labor averages 50 percent of the total project price at about $65 per hour. Expect pricing to vary regionally up to 20 percent due mainly to labor. Material prices stay roughly the same across the country.
In a world that’s moving faster than ever, we know you don’t have any time to waste. So don’t let the installation of a new bath or shower interfere with your busy and active lifestyle. At West Shore Home, we’re focused on being fast, easy, and efficient. Our certified full-time installers work relentlessly to finish your new bathroom quickly, minimizing the impact on your home and life. Whether you need a new bathtub, shower, or tub-to-shower conversion, we’re committed to getting the job done right in just one day, and we cover all our work with a lifetime warranty. Just choose your color, tile pattern, and accessory options to customize your bathroom the way you want it, and we’ll make it happen.
For your remodeled bathroom to operate well, it’s critical to install vent and drain lines of the proper size and slope. Use a 2-in. line to drain the shower and 1-1/2-in. line to drain the sink. The vents for the sink and shower can be 1-1/2-in. pipes, but a toilet should be vented with at least 2-in. material. Make sure that the drain lines drop 1/4 in. for every foot of travel toward the main stack.
A DIY bathroom remodel is a big project. If you can only work weekends, your bathroom will be out of commission for two months or more. You’ll need all your expertise as an experienced do-it-yourselfer because you’ll have to tackle electrical, plumbing, tiling, drywalling, taping and even exterior siding. In this DIY shower remodel article, we’ll deal mostly with the nuts and bolts of ripping out existing plumbing and replacing it correctly with new, easily installed PVC piping.
×