A full bath requires a minimum of 36 to 40 sq. ft. The finished room must measure at least 5 ft. in one direction to accommodate a tub. Building codes typically require 32x32 in. (finished dimensions) for a shower; if you have the space, larger is better. Just make sure the shower is large enough so you can comfortably raise your arms and bend over in the space.
This is great guys! Great work! I'm a retired kitchen guy so I know good work when I see it. I love all of it. My wife and I are doing a Farm kitchen right now as well. Your pictures have me thinking about sending in some before and after of ours. Just like you its the time we get to spend together during the project that makes the whole thing worth while. Great work. I cant say it enough!

Last year I bought a house that had the stainless steel micro model installed. The house was surrounded by 80’ tall Maples & Birch. TONS OF LEAVES.Yes, it the micro mesh keeps all leaf and seeds out of the gutter 100%. What the manf and dealers won’t tell you is that you must clean the mesh 2x’s a year to get spring pollen, mold, & fall leaf dust off. Otherwise it will eventually keep EVERYTHING out, including WATER. Major ice problems flowing over the gutters. No it was not the result of ice damming. I removed it all & just deal with the leaves 3x’s each fall.Got ranch home with easy access to the gutters - get the micro mesh. Easier to clean that than clean gunk out of the gutter.hire a young buck to climb a ladder. A whole lot cheaper.
Nail the bottom plate to the floor and the top plate to the ceiling. Then mark the positions of the shower base, toilet and sink. Lay out and toenail the wall studs into position (Fig. B) and the top plate for the low wall. On the opposite end of the shower, frame a matching 35-in. wide wall (see Photo 14) 60-1/4 in. (or the length of your shower base plus 1/4 in.) away from the first wall.
Unlike clunky over-the-showerhead organizers, a recessed cubby in a tub or shower surround gives shampoo and soap a permanent home and doesn't take up stall space. Size it to minimize tile cuts, and line the bottom with a leftover piece of stone or solid-surface countertop, not tile, so that you won't have to scrape away scum from grout lines. If you have kids, add an extra cubby around knee height so that they can suds up on their own.
Don't lay tile over plywood, which can swell with moisture and break the tile bond. If you're not pouring a new floor, mortar and screw ¼-inch backerboard over a level subfloor, then lay tile on top. Another option: Put in a DITRA flexible underlayment, which helps prevent cracks in ceramic and stone tile by evenly distributing the weight they carry.
Don't lay tile over plywood, which can swell with moisture and break the tile bond. If you're not pouring a new floor, mortar and screw ¼-inch backerboard over a level subfloor, then lay tile on top. Another option: Put in a DITRA flexible underlayment, which helps prevent cracks in ceramic and stone tile by evenly distributing the weight they carry.

The special-order fixtures, fittings, shower pan, tile and glass block panel can take weeks to get in hand, so do the necessary legwork and ordering well in advance. Before gutting the bathroom, check to make sure that there are shutoffs for all the fixtures or a master shutoff for the entire bathroom. If not, buy ball valve shutoffs sized to fit your pipes. Then turn off the main water supply line where it comes into the house from outside, cut the pipes feeding the bathroom and install the new shutoffs right away (see Photo 7).


Disconnect the trap from the tub, remove any clips, fasteners or screws that hold the tub to the wall, and demolish the old cast iron tub with a sledgehammer. Remove the sink and toilet. Turn off the electricity at the main panel and remove light fixtures. Cap the wires with wire connectors. Then rip out the wall finishes and surfaces clean down to the studs and pull out any insulation. If your ceiling is in good shape, use a utility knife to cut the drywall along the edges so the wall materials will separate cleanly from the ceiling.
This is great guys! Great work! I'm a retired kitchen guy so I know good work when I see it. I love all of it. My wife and I are doing a Farm kitchen right now as well. Your pictures have me thinking about sending in some before and after of ours. Just like you its the time we get to spend together during the project that makes the whole thing worth while. Great work. I cant say it enough!
The special-order fixtures, fittings, shower pan, tile and glass block panel can take weeks to get in hand, so do the necessary legwork and ordering well in advance. Before gutting the bathroom, check to make sure that there are shutoffs for all the fixtures or a master shutoff for the entire bathroom. If not, buy ball valve shutoffs sized to fit your pipes. Then turn off the main water supply line where it comes into the house from outside, cut the pipes feeding the bathroom and install the new shutoffs right away (see Photo 7).
An upscale bathroom remodel may include structural changes like expanding or adjusting the layout. Finishes include things like large ceramic floor tile, heated floors, high-end faucets, new lighting, and stone countertops with double sinks. Showers may have frameless glass doors, rain shower fixtures, shower niches and tiled shower walls. Freestanding tubs are also found in this type of bathroom remodel.

Bathroom remodels provide 60 to 70 percent resale returns as a home improvement project. However, this project isn’t cheap. It is essential to plan your remodeling ideas ahead of time. Then, hire a remodeling contractor for the job. Ask questions, set realistic expectations, get accurate cost estimates and budgeting from the start. Also spend time learning how to work with a bathroom contractor.
×