Although this new bathroom is a bit smaller because of additional plumbing walls, it appears larger. Substituting a shower for the bathtub, adding a large mirror, and using a wall-hung sink and toilet all contribute to the spacious feeling. This big-picture stuff is striking, but it’s the step-by-step details that make this small bathroom remodel work. We cover the little kernels of information that will help your project go more smoothly and with fewer headaches.
Glass block comes in 8-in. and 6-in. squares and 4 x 8-in. half-block rectangles. You’ll need to choose between real mortar grout joints and clear silicone–joined blocks. We chose the silicone system because we liked the clean, uninterrupted look. Whichever way you go, buy the panel preassembled and banded together as one unit, ready to set into the opening.
Nail the bottom plate to the floor and the top plate to the ceiling. Then mark the positions of the shower base, toilet and sink. Lay out and toenail the wall studs into position (Fig. B) and the top plate for the low wall. On the opposite end of the shower, frame a matching 35-in. wide wall (see Photo 14) 60-1/4 in. (or the length of your shower base plus 1/4 in.) away from the first wall.
A DIY bathroom remodel is a big project. If you can only work weekends, your bathroom will be out of commission for two months or more. You’ll need all your expertise as an experienced do-it-yourselfer because you’ll have to tackle electrical, plumbing, tiling, drywalling, taping and even exterior siding. In this DIY shower remodel article, we’ll deal mostly with the nuts and bolts of ripping out existing plumbing and replacing it correctly with new, easily installed PVC piping.
The special-order fixtures, fittings, shower pan, tile and glass block panel can take weeks to get in hand, so do the necessary legwork and ordering well in advance. Before gutting the bathroom, check to make sure that there are shutoffs for all the fixtures or a master shutoff for the entire bathroom. If not, buy ball valve shutoffs sized to fit your pipes. Then turn off the main water supply line where it comes into the house from outside, cut the pipes feeding the bathroom and install the new shutoffs right away (see Photo 7).
In a world that’s moving faster than ever, we know you don’t have any time to waste. So don’t let the installation of a new bath or shower interfere with your busy and active lifestyle. At West Shore Home, we’re focused on being fast, easy, and efficient. Our certified full-time installers work relentlessly to finish your new bathroom quickly, minimizing the impact on your home and life. Whether you need a new bathtub, shower, or tub-to-shower conversion, we’re committed to getting the job done right in just one day, and we cover all our work with a lifetime warranty. Just choose your color, tile pattern, and accessory options to customize your bathroom the way you want it, and we’ll make it happen.
A DIY bathroom remodel is a big project. If you can only work weekends, your bathroom will be out of commission for two months or more. You’ll need all your expertise as an experienced do-it-yourselfer because you’ll have to tackle electrical, plumbing, tiling, drywalling, taping and even exterior siding. In this DIY shower remodel article, we’ll deal mostly with the nuts and bolts of ripping out existing plumbing and replacing it correctly with new, easily installed PVC piping.
×