An upscale bathroom remodel may include structural changes like expanding or adjusting the layout. Finishes include things like large ceramic floor tile, heated floors, high-end faucets, new lighting, and stone countertops with double sinks. Showers may have frameless glass doors, rain shower fixtures, shower niches and tiled shower walls. Freestanding tubs are also found in this type of bathroom remodel. 

Toenail 2×6 blocks in the center of the shower 36 in. above the floor for the shower valve and 6 ft. 6 in. above the floor for the showerhead. Position the valve block so the plastic mud guard on the mixing valve will be flush with the finished wall surface. Attach the shower supply line and the hot and cold supply lines to the valve. Clamp the valve body and shower supply line to the blocks with copper pipe straps. Run copper water supplies to the new locations for the sink and toilet.
Time to jump into your DIY pants. I am going to start off with the easiest and most prevalent DIY project around the house. Believe it or not, new paint can transform your bathroom from 1980s drab to 2010s fab. Whether you go bold with dark blue or casual with stripes, new paint will not only give new life to an outdated bathroom, but make it feel larger as well.
The parts of the country with the worst ROI, ranging between 58.8 percent and 59.2 percent, are the East North Central region (Wisconsin, Illinois, Indiana, Michigan and Ohio), the West North Central region (North Dakota, Minnesota, South Dakota, Nebraska, Iowa, Kansas and Missouri) and the Middle Atlantic region (Pennsylvania, New Jersey and New York).
Nail the bottom plate to the floor and the top plate to the ceiling. Then mark the positions of the shower base, toilet and sink. Lay out and toenail the wall studs into position (Fig. B) and the top plate for the low wall. On the opposite end of the shower, frame a matching 35-in. wide wall (see Photo 14) 60-1/4 in. (or the length of your shower base plus 1/4 in.) away from the first wall.
Adding a soaker tub or multi-head shower? You may need a bigger water heater. Tank-style heaters are labeled with a first hour rating (FHR), a measure of how much hot water it produces in an hour. To help determine your FHR, use the list below to calculate your family's hot-water consumption in the bath each morning. Visit the U.S. Department of Energy for more info on FHR.
Glass block comes in 8-in. and 6-in. squares and 4 x 8-in. half-block rectangles. You’ll need to choose between real mortar grout joints and clear silicone–joined blocks. We chose the silicone system because we liked the clean, uninterrupted look. Whichever way you go, buy the panel preassembled and banded together as one unit, ready to set into the opening.

The parts of the country with the worst ROI, ranging between 58.8 percent and 59.2 percent, are the East North Central region (Wisconsin, Illinois, Indiana, Michigan and Ohio), the West North Central region (North Dakota, Minnesota, South Dakota, Nebraska, Iowa, Kansas and Missouri) and the Middle Atlantic region (Pennsylvania, New Jersey and New York).
The special-order fixtures, fittings, shower pan, tile and glass block panel can take weeks to get in hand, so do the necessary legwork and ordering well in advance. Before gutting the bathroom, check to make sure that there are shutoffs for all the fixtures or a master shutoff for the entire bathroom. If not, buy ball valve shutoffs sized to fit your pipes. Then turn off the main water supply line where it comes into the house from outside, cut the pipes feeding the bathroom and install the new shutoffs right away (see Photo 7).
Turn off the main water supply to the house, and in a convenient location, cut the hot and cold water supply pipes for the bathroom. Also cut out and remove all the existing water lines and fittings in the bathroom. Finally, cut out and remove the vent section leading to the sink and the main stack 5 in. below the vent tee. Stuff rags into open drain lines to keep sewer gas out of the house.
×