Toenail 2×6 blocks in the center of the shower 36 in. above the floor for the shower valve and 6 ft. 6 in. above the floor for the showerhead. Position the valve block so the plastic mud guard on the mixing valve will be flush with the finished wall surface. Attach the shower supply line and the hot and cold supply lines to the valve. Clamp the valve body and shower supply line to the blocks with copper pipe straps. Run copper water supplies to the new locations for the sink and toilet.
Proper ventilation will prevent moisture from getting trapped in the bathroom, which can lead to mold and mildew growth. Extract moisture by installing a ducted exhaust fan on a timer. Most timers allow you to set the fan for 15 to 60 minutes to remove heat, steam and condensation. Choose a fan according to the cubic feet per minute of air it moves.
Last year I bought a house that had the stainless steel micro model installed. The house was surrounded by 80’ tall Maples & Birch. TONS OF LEAVES.Yes, it the micro mesh keeps all leaf and seeds out of the gutter 100%. What the manf and dealers won’t tell you is that you must clean the mesh 2x’s a year to get spring pollen, mold, & fall leaf dust off. Otherwise it will eventually keep EVERYTHING out, including WATER. Major ice problems flowing over the gutters. No it was not the result of ice damming. I removed it all & just deal with the leaves 3x’s each fall.Got ranch home with easy access to the gutters - get the micro mesh. Easier to clean that than clean gunk out of the gutter.hire a young buck to climb a ladder. A whole lot cheaper.
Interior bathroom demolition costs $1,000 to $2,300. Prices can go higher if you’re removing and moving walls to create a different footprint. For the experienced DIYer, this is a good place to save money by doing it yourself or assisting the contractor. However, demo can get expensive quickly if you take out a load bearing wall, cut electrical lines or break a water pipe. Avoid the risk by hiring a pro.
×