Very disappointed in this episode and the direction the show is headed. If you watch old episodes there is more focus on how things are built or fixed. Also focus on the correct way to do things. This episode skips over all the details of building. It is becoming just another fixerup tv show where you show the before, some shots of work being done, and then the finished project. You need to remember your roots of teaching homeowners the correct way to do things, even if they hire contractors to do the work. Your show has been successful for 40 years because you have always stuck to the same core values. It looks as though you are throwing them away to be just like every other show.
If your room is wider than the shower base, fur in the walls as needed to butt against the ends of the shower base (see Photo 14). Our bathroom is 6 ft. wide, so we added a floor-to-ceiling 2×6 wall at the showerhead end and a shorter 2×6 wall at the opposite end. We made that wall only 43 in. above the floor so we could use the top of the wall to hold shampoo and other shower supplies. The shower base usually comes with a special 2-in. drain fitting that you connect to the drain line (Fig. B).
Interior bathroom demolition costs $1,000 to $2,300. Prices can go higher if you’re removing and moving walls to create a different footprint. For the experienced DIYer, this is a good place to save money by doing it yourself or assisting the contractor. However, demo can get expensive quickly if you take out a load bearing wall, cut electrical lines or break a water pipe. Avoid the risk by hiring a pro.
Low-flow toilets, which use 1.6 gallons of water per flush, are required by law in all new and remodeled baths. Pressure-assisted toilets effectively clear the bowl with one flush, but make considerable noise in the process. Gravity models sometimes require two flushes to clean the bowl properly. For maximum efficiency, choose a bowl with a large water surface. Make sure there's sufficient space around the toilet for comfortable access—ideally, at least 16 inches from the centerline of the toilet and walls or fixtures on either side. Also allow at least 30 inches from the front of the toilet to the nearest object.
With the rough plumbing complete and the toilet chair carrier in position, finish the electrical and add blocks as needed to support the sink (Photo 15), towel bars, grab bars, etc. Then close up the walls. We recommend cement board for durable tile walls and floors, but other tile backers are available at tile shops. Here are key installation tips:
The average bathroom remodel costs $10,445 Most homeowners spend between $5,975 and $14,927. You can spend as little as $3,500 to $7,000 updating the essentials in a small or medium-sized bathroom. On a large or master bath, you could spend $25,000 or more. Labor averages 50 percent of the total project price at about $65 per hour. Expect pricing to vary regionally up to 20 percent due mainly to labor. Material prices stay roughly the same across the country.
The wall behind the toilet can be almost any height. For a standard toilet height of 15 in., make the wall a minimum height of 43 in. If you’d like a higher toilet, make the wall that much higher. Or, make the wall go all the way to the ceiling. We built a short wall to conserve space and to create a shelf and a mirror alcove. The wall at the opposite end of the shower can be any height as well. We made it the same height as the toilet/sink wall so we could line up the accent tile and make a convenient shower shelf.
Remodeling your bathroom might seem like a complex task, but proper planning can help you get the look and feel you want for your home. Use this guide to learn more about the benefits of remodeling your powder room, guest bathroom or master bathroom space. Typically, bathroom remodels start at $5,000 and can vary based on the size of your room and the products you choose to update.

With the rough plumbing complete and the toilet chair carrier in position, finish the electrical and add blocks as needed to support the sink (Photo 15), towel bars, grab bars, etc. Then close up the walls. We recommend cement board for durable tile walls and floors, but other tile backers are available at tile shops. Here are key installation tips:

Tile the walls first, then the floor. When tiling around the window, keep the tile about 1/8 in. away from the glass block. Tile the floor, starting by carefully snapping center lines to lay out border strips and field tile. Work from those lines to get evenly spaced tiles throughout the floor. Grout the walls and floors but caulk the inside corners between floors and walls and where walls meet.
Last year I bought a house that had the stainless steel micro model installed. The house was surrounded by 80’ tall Maples & Birch. TONS OF LEAVES.Yes, it the micro mesh keeps all leaf and seeds out of the gutter 100%. What the manf and dealers won’t tell you is that you must clean the mesh 2x’s a year to get spring pollen, mold, & fall leaf dust off. Otherwise it will eventually keep EVERYTHING out, including WATER. Major ice problems flowing over the gutters. No it was not the result of ice damming. I removed it all & just deal with the leaves 3x’s each fall.Got ranch home with easy access to the gutters - get the micro mesh. Easier to clean that than clean gunk out of the gutter.hire a young buck to climb a ladder. A whole lot cheaper.
×