Great tips. At the onset of explaining various causes of a squeak, Tom Silva says it can be alignment, either of the door-to-hinge, or hinge-to-hinge. Hmm, seems to me those two scenarios different than the case in the vid, that being singular hinge with the barrels out of alignment. So, the vid shows a great solution to fixing out of alignment barrels, but what about fixing doors with hinges out of alignment from each other, or hinges out of alighment on the door? How do you make that determinations, and what is the solution? thx
Toenail 2×6 blocks in the center of the shower 36 in. above the floor for the shower valve and 6 ft. 6 in. above the floor for the showerhead. Position the valve block so the plastic mud guard on the mixing valve will be flush with the finished wall surface. Attach the shower supply line and the hot and cold supply lines to the valve. Clamp the valve body and shower supply line to the blocks with copper pipe straps. Run copper water supplies to the new locations for the sink and toilet.

Tear out the existing piping (Photos 5 and 6). Then frame the 2×6 walls that will contain the new plumbing and the opposite end of the shower base (Photos 8, 9 and 14). It’s easiest to nail the bottom plate to the floor and the top plate to the ceiling, then fill in the studs one at a time by toenailing them in at the top and bottom. Stack the studs directly in front of the old ones wherever possible. Space the studs in the center of the shower about 12 in. apart to leave room for the shower valve and showerhead. The studs behind the toilet should be spaced exactly 19-3/4 in. apart for securing this toilet chair carrier (Photos 8 and 15).
A DIY bathroom remodel is a big project. If you can only work weekends, your bathroom will be out of commission for two months or more. You’ll need all your expertise as an experienced do-it-yourselfer because you’ll have to tackle electrical, plumbing, tiling, drywalling, taping and even exterior siding. In this DIY shower remodel article, we’ll deal mostly with the nuts and bolts of ripping out existing plumbing and replacing it correctly with new, easily installed PVC piping. 
×