Very disappointed in this episode and the direction the show is headed. If you watch old episodes there is more focus on how things are built or fixed. Also focus on the correct way to do things. This episode skips over all the details of building. It is becoming just another fixerup tv show where you show the before, some shots of work being done, and then the finished project. You need to remember your roots of teaching homeowners the correct way to do things, even if they hire contractors to do the work. Your show has been successful for 40 years because you have always stuck to the same core values. It looks as though you are throwing them away to be just like every other show.


An upscale bathroom remodel may include structural changes like expanding or adjusting the layout. Finishes include things like large ceramic floor tile, heated floors, high-end faucets, new lighting, and stone countertops with double sinks. Showers may have frameless glass doors, rain shower fixtures, shower niches and tiled shower walls. Freestanding tubs are also found in this type of bathroom remodel.
An upscale bathroom remodel may include structural changes like expanding or adjusting the layout. Finishes include things like large ceramic floor tile, heated floors, high-end faucets, new lighting, and stone countertops with double sinks. Showers may have frameless glass doors, rain shower fixtures, shower niches and tiled shower walls. Freestanding tubs are also found in this type of bathroom remodel.
When you use a bold accessory like an animal skin, you need to make sure that it isn't lost in a bunch of other decor elements. This bathroom uses its neutral, modern design to really give space to the zebra skin rug here. And the great thing about this kind of design is that you can change this one decor element as often as you wish, without having to spend thousands remodeling every time.
A DIY bathroom remodel is a big project. If you can only work weekends, your bathroom will be out of commission for two months or more. You’ll need all your expertise as an experienced do-it-yourselfer because you’ll have to tackle electrical, plumbing, tiling, drywalling, taping and even exterior siding. In this DIY shower remodel article, we’ll deal mostly with the nuts and bolts of ripping out existing plumbing and replacing it correctly with new, easily installed PVC piping.

The Home Depot is a great place to buy your bathroom essentials and remodeling materials. We also provide top-rated design and installation services for homeowners across America. Besides undergoing full background checks, our hand-selected remodeling experts are local, licensed and insured. The Home Depot also offers a great selection of flexible finance options.
The key to a weatherproof, attractive glass block window both inside and out is to encase it in a custom-built wooden frame (Fig. A) with inside dimensions that are 1/2 in. taller and wider than the panel itself. That will give you room to adjust and shim the panel exactly and then inject expanding foam between the frame and the panel to lock it into the opening (Photos 3 and 4).
The tank is concealed within a 2×6 wall that’s built in front of the existing plumbing wall. It does require some plumbing rerouting because the waste line runs through the wall instead of the basic floor-mounted toilet flange (see Photos 8 – 12). The toilet can be ordered with a wall-mounted access panel/flush button like ours or with the panel mounted on top of a half wall. A ‘chair carrier’ (Photo 11) comes with the toilet. This steel framework contains the toilet and operating mechanisms and is designed to support the weight of the toilet.

Follow Fig. B, for the new drain/vent plan. The new shower drain is vented separately into the main stack (Photos 10, 12 and 13). Most bathrooms have the main stack positioned directly behind the toilet. The wall-mounted toilet shown here cannot be positioned directly behind the stack because there’s not room for the necessary elbows. If your stack is more than 12 in. to the side of the existing toilet, you can keep the same location for the wall-hung toilet. But if it’s directly behind it, you’ll need to swap the sink and toilet locations like we did.


Turn off the main water supply to the house, and in a convenient location, cut the hot and cold water supply pipes for the bathroom. Also cut out and remove all the existing water lines and fittings in the bathroom. Finally, cut out and remove the vent section leading to the sink and the main stack 5 in. below the vent tee. Stuff rags into open drain lines to keep sewer gas out of the house.
Although this new bathroom is a bit smaller because of additional plumbing walls, it appears larger. Substituting a shower for the bathtub, adding a large mirror, and using a wall-hung sink and toilet all contribute to the spacious feeling. This big-picture stuff is striking, but it’s the step-by-step details that make this small bathroom remodel work. We cover the little kernels of information that will help your project go more smoothly and with fewer headaches.

Flank the mirror with fixtures placed at eye level (around 66 inches), ideally spaced 36 to 40 inches apart. Try to see fixtures in action before you buy to make sure the amount and quality of light is sufficient. If there's no room for side sconces, install a long fixture on the wall above the mirror. Don't rely on a recessed ceiling fixture (think Dracula face).
Don't lay tile over plywood, which can swell with moisture and break the tile bond. If you're not pouring a new floor, mortar and screw ¼-inch backerboard over a level subfloor, then lay tile on top. Another option: Put in a DITRA flexible underlayment, which helps prevent cracks in ceramic and stone tile by evenly distributing the weight they carry.

Glass block comes in 8-in. and 6-in. squares and 4 x 8-in. half-block rectangles. You’ll need to choose between real mortar grout joints and clear silicone–joined blocks. We chose the silicone system because we liked the clean, uninterrupted look. Whichever way you go, buy the panel preassembled and banded together as one unit, ready to set into the opening.


The special-order fixtures, fittings, shower pan, tile and glass block panel can take weeks to get in hand, so do the necessary legwork and ordering well in advance. Before gutting the bathroom, check to make sure that there are shutoffs for all the fixtures or a master shutoff for the entire bathroom. If not, buy ball valve shutoffs sized to fit your pipes. Then turn off the main water supply line where it comes into the house from outside, cut the pipes feeding the bathroom and install the new shutoffs right away (see Photo 7).
Glass block comes in 8-in. and 6-in. squares and 4 x 8-in. half-block rectangles. You’ll need to choose between real mortar grout joints and clear silicone–joined blocks. We chose the silicone system because we liked the clean, uninterrupted look. Whichever way you go, buy the panel preassembled and banded together as one unit, ready to set into the opening.
Although this new bathroom is a bit smaller because of additional plumbing walls, it appears larger. Substituting a shower for the bathtub, adding a large mirror, and using a wall-hung sink and toilet all contribute to the spacious feeling. This big-picture stuff is striking, but it’s the step-by-step details that make this small bathroom remodel work. We cover the little kernels of information that will help your project go more smoothly and with fewer headaches.
×