In a world that’s moving faster than ever, we know you don’t have any time to waste. So don’t let the installation of a new bath or shower interfere with your busy and active lifestyle. At West Shore Home, we’re focused on being fast, easy, and efficient. Our certified full-time installers work relentlessly to finish your new bathroom quickly, minimizing the impact on your home and life. Whether you need a new bathtub, shower, or tub-to-shower conversion, we’re committed to getting the job done right in just one day, and we cover all our work with a lifetime warranty. Just choose your color, tile pattern, and accessory options to customize your bathroom the way you want it, and we’ll make it happen.
Interior bathroom demolition costs $1,000 to $2,300. Prices can go higher if you’re removing and moving walls to create a different footprint. For the experienced DIYer, this is a good place to save money by doing it yourself or assisting the contractor. However, demo can get expensive quickly if you take out a load bearing wall, cut electrical lines or break a water pipe. Avoid the risk by hiring a pro.

Adequate lighting is needed for all forms of grooming. Include task-specific and ambient, or general, light. Multiple recessed ceiling fixtures are all but invisible and eliminate the locker-room look of a single ceiling-mounted fixture. Include a light fixture above the tub and/or in the shower. Avoid fluorescent lights, which alter the color of your complexion.
Handheld showers and easy-to-grip lever faucets suit people of all abilities and can be put in any time. But plan permanent features early on. Grab bars should be secured to blocking between wall studs and placed 33 to 36 inches off the floor. Other things to consider: a barrier-free shower, a wider doorway, and a lower sink height. Visit the National Kitchen and Bath Association's website for more guidelines.
I acknowledge that The Home Depot is partnering with me to participate in this Delta UPstile Program (the “Program”). As a part of the Program, I am receiving compensation in the form of products and services, for the purpose of promoting The Home Depot. All expressed opinions and experiences are my own words. My post complies with the Word Of Mouth Marketing Association (WOMMA) Ethics Code and applicable Federal Trade Commission guidelines.
Tile the walls first, then the floor. When tiling around the window, keep the tile about 1/8 in. away from the glass block. Tile the floor, starting by carefully snapping center lines to lay out border strips and field tile. Work from those lines to get evenly spaced tiles throughout the floor. Grout the walls and floors but caulk the inside corners between floors and walls and where walls meet.
Adding a soaker tub or multi-head shower? You may need a bigger water heater. Tank-style heaters are labeled with a first hour rating (FHR), a measure of how much hot water it produces in an hour. To help determine your FHR, use the list below to calculate your family's hot-water consumption in the bath each morning. Visit the U.S. Department of Energy for more info on FHR.

Very disappointed in this episode and the direction the show is headed. If you watch old episodes there is more focus on how things are built or fixed. Also focus on the correct way to do things. This episode skips over all the details of building. It is becoming just another fixerup tv show where you show the before, some shots of work being done, and then the finished project. You need to remember your roots of teaching homeowners the correct way to do things, even if they hire contractors to do the work. Your show has been successful for 40 years because you have always stuck to the same core values. It looks as though you are throwing them away to be just like every other show.
Turn off the main water supply to the house, and in a convenient location, cut the hot and cold water supply pipes for the bathroom. Also cut out and remove all the existing water lines and fittings in the bathroom. Finally, cut out and remove the vent section leading to the sink and the main stack 5 in. below the vent tee. Stuff rags into open drain lines to keep sewer gas out of the house.
×