Nail the bottom plate to the floor and the top plate to the ceiling. Then mark the positions of the shower base, toilet and sink. Lay out and toenail the wall studs into position (Fig. B) and the top plate for the low wall. On the opposite end of the shower, frame a matching 35-in. wide wall (see Photo 14) 60-1/4 in. (or the length of your shower base plus 1/4 in.) away from the first wall.
Great tips. At the onset of explaining various causes of a squeak, Tom Silva says it can be alignment, either of the door-to-hinge, or hinge-to-hinge. Hmm, seems to me those two scenarios different than the case in the vid, that being singular hinge with the barrels out of alignment. So, the vid shows a great solution to fixing out of alignment barrels, but what about fixing doors with hinges out of alignment from each other, or hinges out of alighment on the door? How do you make that determinations, and what is the solution? thx
With the rough plumbing complete and the toilet chair carrier in position, finish the electrical and add blocks as needed to support the sink (Photo 15), towel bars, grab bars, etc. Then close up the walls. We recommend cement board for durable tile walls and floors, but other tile backers are available at tile shops. Here are key installation tips:

Adding a soaker tub or multi-head shower? You may need a bigger water heater. Tank-style heaters are labeled with a first hour rating (FHR), a measure of how much hot water it produces in an hour. To help determine your FHR, use the list below to calculate your family's hot-water consumption in the bath each morning. Visit the U.S. Department of Energy for more info on FHR.
The “Gorilla Style” Method: Bend a metal coat hanger so that the hanger portion forms a hook. This is a great way to fish out any clumps of slimy hair that might be clogging your shower drain. With an old plastic grocery bag acting as your catch-all for the mess, quickly tie the bag shut when all the gunk is gone to contain the odor. Pour baking soda down the shower drain. Then, add vinegar and immediately plug the shower drain with the rag. Wait 20 minutes for tougher clogs.
The special-order fixtures, fittings, shower pan, tile and glass block panel can take weeks to get in hand, so do the necessary legwork and ordering well in advance. Before gutting the bathroom, check to make sure that there are shutoffs for all the fixtures or a master shutoff for the entire bathroom. If not, buy ball valve shutoffs sized to fit your pipes. Then turn off the main water supply line where it comes into the house from outside, cut the pipes feeding the bathroom and install the new shutoffs right away (see Photo 7).
×